
- HOME
- Why Choose SCS?
- News Room
- Certification
Management Systems Certification Product Certification CSA SG Cyber Safe Trustmark & Essentials Mark Certified Companies - WSH Audits
- Resources
- Training
- Contact
- Admin
Forms (Auditors)



Note 1: Inspector days will be different between SAC / Non-SAC accredited certification body.
Note 2: Inspector days for each subsequent batching plant (BP) using a different mixer in the same location and using the same constituent material from the sources as the first batching plant, would be reduced by 0.5 inspector day.
Note 3: 35 samples exceeding 3 months and meet the concrete strength characteristic.
Structural Steel Fabrication Product Certification Process
Note 1: To request for quotation, please contact our Sales Department either via email (certints@singnet.com.sg) or phone at 6299 9001 ext 1.
Note 2: Initial Inspector days will be further reduced for 0.5 day provided the certification audit of ISO 9001 & SS EN 1090-1&2 are carried out together by the same certification body.
Note 3: Kindly note document review will be carried out prior to on-site initial inspection.
Note 4: The frequency of ongoing surveillance inspection will be following the requirements from SS EN 1090-1, Annex B, Table B.3.
Organic Primary Produce/ Specification for clean and green urban farms/ Specification for good agriculture practice/ Specification for good aquaculture practice / Specifications for good animal husbandry practice for layer farms Certification Auditing Process
NOTE: SS 632
Note 1: Each certification cycle is valid for one year.
Note 2: Unannounced visits are dependent on the risk category.NOTE: SS 661/ SS 675/ SS 670/ SS 676
Note 1: The Certificate of Conformity (CoC) is valid for two years with recertification subject to continuing satisfactory performance.
Note 2: Surveillance inspection shall be conducted within 12 months after the initial inspection or recertification.
In-Situ Post Tensioning Works Certification - Auditing Process
*Note 1: Initial Inspection covers two stages audit (i) stage 1 introductory meeting (ii) stage 2 includes 1 Office Audit and
2 Sites Audit as per SAC CT 22*Note 2: The frequency of ongoing surveillance inspection will be following the requirements from SAC CT 22, 30 Nov 2021, Clause 8 Table 2.